Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Back Filling Material
Reference: BID10089 12/20/2009, Location: Middle East
Category: Security and Safety Equipment

Ref. No.: LTC-LR-1267-09
Bid Bond: QAR 2,000,000
Fee: QAR 100
Issue Date: 20-Dec-2009
Pre-Tender Meeting Date: 05-Jan-2010 at Auditorium HQ Building at Ras Laffan.
Bid Closing Date: 11-Jan-2010
Offer Validity: 180 days from the Bid Closing Date
Bond Validity: 180 days from the Bid Closing Date
Location: CLTC Secretary, 6th Floor, Salam Towers, West Bay, Doha.

Scope of Work:
Laffan Refinery Phase 2 Development Project (LR2) requires supply of approximately 900,000 m3 of class A backfill material and grade and laying / compaction of 500,000 m3 of this material within the Laffan Refinery expansion project located in Ras Laffan Industrial City during the period 1Q2010 to 4Q2010.



Related Prooducts: Security and Safety Equipment Fire Fighting Houses  Fire Fighting Vehicles & trucks  Fire Protection & Suppressing Equipment  Gas Detection equipment  General  Life Saving Equipment at sea  Portable Extinguishers  Pressure Relief & Rupture Devices  Safety Equipment/Supplies  Security Control Equipment  Spill Control Equipment  Surveillance Equipment  Tubular Inspection Equipment 

Related Tenders: Fire Fighting Houses  Fire Fighting Vehicles & trucks  Fire Protection & Suppressing Equipment  Gas Detection equipment  General  Life Saving Equipment at sea  Portable Extinguishers  Safety Equipment/Supplies  Security Control Equipment  Spill Control Equipment  Surveillance Equipment  Tubular Inspection Equipment 

Tap Oil to Announce Woollybutt Dry Docking Update
Topaz Enters into MOA for $29.5 m Vessel Sale
Zambia Invites Second Round of Oil Exploration Bids
Salamander Provides Operational Update in Thailand

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us