Feed for Gas Pipeline
Reference: LT10104400 5/17/2010, Location: Middle East
Category: Engineering
Scope of Work
FEED for the installation of 20" wet gas pipeline to avoid flaring by providing a bi-directional pipeline and facilities for diverting either 1st stage gas at KM during the outage of its gas compressor to LP dehydration unit at KS or 1st stage RAG at KS to KM for compression, during the outage of KS gas lift TEG and FN gas lift compressors.
|