Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Repair Cairs#1428 on Oil Pipeline
Reference: LT10104700 5/16/2010, Location: Middle East
Category: Maintenance and Repair

Scope of Work
24" crude oil pipeline from Dukhan to Mesaieed tank farm dent repair by one of two options "
Repair the Large Indentation from the vehicle impact by cutting 22 meters and replacing of the dent area with one of two options:

- Option # 1: TDW or equivalent plugging system using two fittings and product temporarily stopped and finally using TDW or equivalent Lock-O-Ring Plug. The flow interruption shall not exceed fourteen calendar days.

- Option # 2 (Alternative):
1- No interruption of crude oil flow in the pipeline by TDW or equivalent double stopple line procedure using four hot tapping fittings and a bypass and finally TDW or equivalent Lock-O-Ring Plug.
2- Repair Damaged Pipe retainers.
3- Repaint the repaired area according to the company specification # QP-SPC-L-002 Schedule 2U.



Related Prooducts: Maintenance and Repair Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Tenders: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Decommissioning Work of Iwaki Platform, Off Japan
Feasibility Study on Toyama Line Commences
Participation in the Sebuku Block
Invitation to Tender for Central Processing Facility
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us