Supply of Mass Flow Meter
Reference: 18F/2010 5/17/2010, Location: Middle East
Category: Mass Flowmeter
Scope of Work
The company intend to supply and install one L.P.G. Ex proof high accurate and direct coriolis mass flow metering skid to measure flow in Baghdad / Bub Alsham plant. The summery of the items required to be supplied are: 1- All system materials (main component and auxiliary materials)
2- All system design and engineering works.
3- Provide the approved documents for (engineering factory and testing) and procedure for (installation, maintenance, operation and calibration).
4- Fat and Sat certification by third party inspection and (G.F.C.) Packing.
5- Warranties and one-year maintenance guarantee.
6- Supply of spare parts for 5 years.
7- The auxiliary components shall be consisting of the following items: A- Power and grounding cables and their cabling materials. B- Instrumentation cable, cable glands, termination, accessories, trays, compressions fitting, etc, as required for a distance from skid to control room approximately 300 MT. C- Necessary sockets, fitting, sealing…etc. D- Necessary tools for installing, operating, maintenance, testing and calibration the electrical installation will be fully weather proof and suitable for hazardous area classification. E- The supplier shall provide supervision for following activities (layout preparation works for installing, operation, and calibration the metering skid system on site).
8- Pipeline size 3 inches.
9- The skid shall be installed, commissioned and locally calibrated by supplier.
|