Procurement & Installation of Crude Heater
Reference: 605 5/31/2010, Location: Africa
Category: Process Equipment
Scope of Work
Replacing one of the crude oil heater installed at Contract Area “B” (A100 Onshore Field) having maximum operating flow-rate of 6000 bbls/hour at maximum operating temperature of 93 degrees Celsius and maximum working pressure of 365 PSI.
The qualified bidder shall supply the required stated crude oil heater, the 2-years spare parts including the installation, commissioning and start-up of the unit.
|