EPIC for Upgrade of Turbine Controls
Reference: GT10105500 6/24/2010, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
EPIC for upgrading and replacing the existing General Electric (GE) make Mark-V turbines control system, Compressor Control Corp (CCC) Anti-Surge control and Bentley Nevada machine vibration and condition monitoring protection system of the turbo compressors with latest technology systems in RG plant and FNLGCS.
|