Pipeline and Fiscal Metering Station
Reference: 39-2010 7/28/2010, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
The company announces its need for Engineering, Procurement, Supply and Delivery, Construction, Commissioning and Start-up services for Al Naseriah gas pipeline and FMS project in the Syrian Arab Republic for all disciplines and activities including but not limited to: Pipeline installation, fiscal metering station (FMS) and tie- in points with existing facilities for all required activities but not limited to: civil, survey, soil investigation, structural, mechanical, instrumentation, electrical, control, telecommunication, cathodic protection, pre-commissioning, commissioning, start-up activities and utility systems etc in addition to any activity required to make the system function based on turnkey job basis.
The project includes but not limited to the following: 1- Installing approximately 15 km of 24" API 5L X 60 Pipeline between existing piping at 6007A to new Nasseriah power plant. 2- Launcher at existing piping at 6007A. 3- Receiver at the new Nasseriah power plant. 4- The Nasseriah FMS near the new Nasseriah power plant area with 2 MMSCMD capacity. 5- Two Tie-Ins with Existing Gas net work.
|