Plant Change Requests Implementation
Reference: LT10106900 8/2/2010, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
The relevant scope of work outlines the requirements upon which contractor shall carry out the work that include Procurement, Material Supply, Installation / Construction, Inspection, Testing, Pre-Commissioning and Commissioning for implementation of the following 5 mechanical Plant Change Requests (PCRs) at NGL Plants in Mesaieed:
1- PCR/GP/07/299 - Provide water circulation facility for safety showers at sub-station 41, Electro-chlorinator A-3105 and the Jetty head.
2- PCR/GP/07/300 - Extend individual foam hydrant in NGL Jetty area for easy access to take connection during fire hazard.
3- PCR/GP/08/310 - Re-routing if 1 ½" Methanol line (Underground portion) from P-3302 to P-2107 & P-2108.
4- PCR/OEE/GP/08/320 - Provide additional block valve at E-3205 (NGL-2 Instrument Air Compressor drier outlet exchange) discharge.
5- PCR/OEE/GP/08/321 - modification of E-1313A/B cooling water outlet line NGL-1.
|