Dehydration and Desalting Unit
Reference: PRJ.10.4081 8/15/2010, Location: Middle East
Category: Gas dehydration

Scope of Work
Noor oil field is one of important crude oil fields within the company responsibility. It is located at about 10km northeast Amara city. This field is partially developed & the existing production facilities (degassing station – one bank) (40000 bopd) design capacity. The company intends to develop this field up to production rate of 40000 bopd during the next two years, due to expected wet crude oil produced later on. The company intends to install a new dehydration & desalting unit to treat crude oil with a capacity of 40000 bopd, including & not limited to:

- Two indirect water bath heaters, each heater with capacity of 40000(bopd).
- Complete dehydrator, with top mounting degasser with all accessories.
- Complete desalter with top mounting degasser with all accessories.
- Process equipment electrical system including PMCCS inters connecting cabling and accessories.
- Complete package of control system local and remote.
- Interconnecting piping sys. Including valves & fittings and accessories.
- Process pumps such as fresh water pumps (2*100%) & recycle pump (2*100%).
- A complete effluent water treatment system friendly environment type taking into consideration that the plant located at water flooded area drained to Water River & marsh. The unit should be contained two skimmed oil pumps & two effluent water pumps & filtering system to get clear water to be drained to a decantation pit.
- A complete set of drainage system, with a suitable pump with all accessories.
- A complete sets of chemical system (demulsifier & anti corrosion system & anti foaming system)

The scope of work required covering design, engineering details, procurement of equipment and materials, delivery of equipment and materials. The unit shall be designed for 40000-bbl/d dry crude basis. Vessels prefabrication shall be carried outside the country.

Scope of work also include details of design vessels fabrication drawings and hook up drawing, ISO metrics drawing, construction and commissioning procedures, . etc. It shall include performance guarantees and equipment / materials guarantee for 12 months after provisional acceptance.



Related Prooducts: Gas dehydration Deodorization system  Gas dehydration  Gas sweetening  Gas Treating  General  GTL Processing  LNG Processing  LPG Domestic use  LPG Odorless  Packing  Phase Separation  Scrubbers 

Related Tenders: Gas dehydration  Gas sweetening  Gas Treating  General  LNG Processing  LPG Domestic use  Packing  Phase Separation  Scrubbers 

Pluspetrol's Castanha-2 Appraisal Well Suspended
Drilling Activity Update: Castanha-3 Appraisal Well
ROC Sells Interest in Offshore Carnarvon Basin
Positive Results from Castanha-4 Well, Onshore Angola
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us