Production Facilities Pre-Qualification
Reference: SOR 2078 R1 8/24/2010, Location: Africa
Category: Engineering Procurement and Construction (EPC)
Scope of Work
The work will include all the facilities to gather, process, condition, treat and ship a total of 18,000 Barrels of oil per day. The scope of the facilities includes re-route flow lines from wells to manifold, oil processing train, one produced water treatment facility having design capacity of 30,000 BWPD, and oil export pipeline.
|