Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Electrostatic Desalter Skids
Reference: TA/20100920/03/P 9/20/2010, Location: Middle East
Category: Desalination Plant

Scope of Work
Supply of # 3 electrostatic desalter skid (including vessel, mixer, transformer, electrical parts, instrument and control system, piping, structure steel etc.) for Central Processing Facilities (CPF1) station in the field.

Operating Conditions:
Fluid: Mixture of Oil and Water
Operating Temperature: 90°,
Operating Pressure: 0.4 Mpag,
Crude Oil Capacity (Each): 220 m3/h,
Inside Diameter: 3600 mm,
Shell Length
(S/S): 18000 mm.

Contract Duration: 30 months.



Related Prooducts: Desalination Plant General  RO Membrane 

Related Tenders: General  RO Membrane 

Fluor Named as PMC for ADNOC's Abu Dhabi Gas
Fluor Wins PMC Contract for New Refinery
Fluor and Russia's SIBUR Memorandum of Understanding
Fluor to Perform Early Works in Iraq for ExxonMobil
Oil & Gas Companies
Oil Sands
Production
Development
Oil Treating & Refining
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us