Oil Production Facilities Design
Reference: MS/89/110 10/11/2010, Location: Asia
Category: Production
Scope of Work
The company intends to open an international tender for the island New 200,000 bb/day production facilities.
The main objective of the study is to design of new oil production facilities as a Lump Sum project. New production facilities must be capable to separate and stabilized 200,000 bbl/day of crude oil. For this reason three main goals must be covered by consultant: 1- Conceptual study 2- Design new production facilities (Front End Engineering Design "FEED") 3- Preparing of EPC package for relevant Tender
Contract period: eight months
|