EPIC of New 11KV Switchgear
Reference: GT11101200 1/27/2011, Location: Middle East
Category: Switches
Scope of Work
Contractor shall supply all labor services, supervision, expertize, spare parts, equipment, tools and each and every items of expense necessary in order to carry out the design, detailed engineering, procurement, installation, testing, pre-commissioning and commissioning for the replacement of the existing #2 of 11kv switchgears at substations 1375a and 2301k respectively, in mesaieed refinery.
|