Crude Oil Supply Line Replacement
Reference: RFP - 2322 4/17/2011, Location: Middle East
Category: Oil and Gas Pipeline
Scope of Work
Replace the supply line of current crude oil 16-inch diameter connecting between the center of the main assembly in abundance to the manifold Burgan TB-1.
|