Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

EPIC of Sea Water Lines Replacement
Reference: GT11107100 5/26/2011, Location: Middle East
Category: Gas Processing

Scope of Work
The company intends to improve its operational processes, environmental controls and safety regime at its existing NGL Plants, Gas Operations by implementing additions and modifications.

The scope of work includes verification of engineering, procurement, supply of materials, installation, testing, inspection, pre-Commissioning and commissioning of 16 PCRs and replacement of seawater cement lined carbon steel piping with GRP/GRE material. This project is shutdown sensitive and is required to be implemented during the planned NGL-4 shutdown during Feb-March 2012.



Related Prooducts: Gas Processing Deodorization system  Gas dehydration  Gas sweetening  Gas Treating  General  GTL Processing  LNG Processing  LPG Domestic use  LPG Odorless  Packing  Phase Separation  Scrubbers 

Related Tenders: Gas dehydration  Gas sweetening  Gas Treating  General  LNG Processing  LPG Domestic use  Packing  Phase Separation  Scrubbers 

PGNiG SA Increases Production of Natural Gas
PetroSA Eyes Joint Venture with Egypt Firm
Solarcity Named Green Power Supplier of the Year
Topoyaco-2 Indicates Oil Sandstones and Carbonates
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us