|
|
|
EPIC for HV Substation SCADA System Upgrade
Reference: GT11110100 7/24/2011, Location: Middle East
Category: SCADA Systems
Scope of Work
The objective of this project is to integrate all the unmanned Dukhan HV Substations into the new SCADA PMS. Existing HV stations SCS shall be upgraded to utilize the remote operation of switching devices. The telecommunication network shall be made reliable, secure and dedicated so that in the future, QP will be able to utilize the built-in option of remote switching from new proposed HV SCADA control center. Remote monitoring and Control are the major intended functionalities of the new SCADA PMS.
|
Related Prooducts: SCADA Systems
Analyzers, Gas
Calibration Equipment
Calibrators, Electronic, Pneumatic
Concentration
Conductivity Meters
Density
Detector, Gas
Dissolved Oxygen meters
Drilling Instruments
Float Switch
Gas meters
General
Indicators and Recorders
Leak Locators
Level meters
Liquid Measurement
Load cells
Monitoring & Control
Mud Control
Mud Logging
pH and REDOX
Pressure gauges/ Transmitters
Radiation Detection
SCADA Systems
Temperature gauges/ Transmitters
Thermocouples
Thermowells
Transducers
Transmitters
Transmitters, Pressure
Turbidity Meters
Viscosity
Weather Station
Weighing Equipment
Related Tenders:
Analyzers, Gas
Calibration Equipment
Calibrators, Electronic, Pneumatic
Conductivity Meters
Density
Detector, Gas
Dissolved Oxygen meters
Drilling Instruments
Gas meters
General
Indicators and Recorders
Leak Locators
Level meters
Liquid Measurement
Monitoring & Control
Mud Logging
Pressure gauges/ Transmitters
SCADA Systems
Temperature gauges/ Transmitters
Thermocouples
Thermowells
Transmitters
Transmitters, Pressure
Viscosity
Weather Station
|
|
|
|