Implementation of Mechanical Plant Change Requests
Reference: GT11110400 8/1/2011, Location: Middle East
Category: Site Survey
Scope of Work
Contractor shall carry out the work that includes site survey, verifying and/or amending the design and detailed engineering, procurement, material supply, installation / construction, inspection, testing, pre-commissioning and commissioning (EPIC) for implementation of the mechanical plant change requests (PCRs) at QP's NGL- 1 & 2 Plants in Mesaieed. The objective of this contract is to extend the major shutdown cycle for NGL-1/2 Plants from the normal two (2) years to four (4) years.
|