EPIC to Upgrade the Turbine Air Intake Filtration System
Reference: GT11110700 8/4/2011, Location: Middle East
Category: Filtration, Separation
Scope of Work
The scope consists to carry out the design and detailed Engineering, Procurement, Installation, Construction, Pre-commissioning, Commissioning and Testing of the completely New and Upgraded Air Inlet Filter Systems for Solar Turbines installed at Khatiya North, Khatiya Main, and Fahahil Main within Dukhan Fields.
|