EPIC for Upgrading the Instrument Air System
Reference: GT11111600 9/19/2011, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
Contractor scope of work shall include site survey, Design and Detailed Engineering, Procurement, Installation, Construction/ Demolition, Pre-commissioning, Commissioning and Testing for upgrading the Instrument Air System Facility at Khatiyah North Degassing Station (KNDS) to meet the required present and future capacity and integration with the existing systems.
|