Replacement of 16” Condensate Line
Reference: RFP-2280 10/16/2011, Location: Middle East
Category: Oil and Gas Pipeline
Scope of Work
The works to be carried out by the Contractor are for site survey, design and engineering, HSE related works, procurement, inspection, supply of materials, construction, installation, testing and commissioning, performance testing, and putting into successful operation and handing over of a new 20” dia. pipeline from Gas & condensate Manifold up to LPG Plant inside KNPC Refinery, together with all associated mechanical, pipeline and piping works; civil and structural works; electrical works; cathodic protection and corrosion monitoring works; instrumentation and telemetry works; fire safety and security system works; and removal of the existing 16” Condensate Line from Manifold GCMB to Manifold MAA-0 2.
|