Continuous Emission Monitoring System
Reference: GT11114300 12/1/2011, Location: Middle East
Category: Monitoring & Control
Scope of Work
EPIC for Installation of Continuous Emission Monitoring System (CEMS) in the stacks of various Furnaces and Turbines at NGL-1&3, Mesaieed. The CEMS will be used to demonstrate that emission from the relevant stacks complied with the Ministry of Environment (MoE) Regulations.
|