Switchboards Upgrade / Retrofit
Reference: LT11111900 12/15/2011, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
Contractor shall be responsible for Engineering, Procurement, Installation and Commissioning of the following : "Upgrade / retrofit Switchboards QC-2 and QC-3. Existing OCBs and Oil filled VTs in 3.3kV Switchboards QC-2 and QC-3, SS 3401 and SS 1600 shall be replaced. Contract Duration: Fifteen (15) calendar months Estimated Start of Work : 30/05/2012.
|