Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

New Sports Facility
Reference: GT11114900 12/22/2011, Location: Middle East
Category: Engineering Procurement and Construction (EPC)

Scope of Work
The Scope of Work shall include but not limited to Site survey, studies, engineering and Construction Tender package necessary for the Conceptual and Detailed Design for New Sports facility at Halul Island. The New Sports facility is a new 2- storey multi-purpose Sports facility complete with external games court. Minimum 5 years consultancy and detailed design experience in Oil/Gas Industry along with planning and design of infrastucture of Indoor Sports Complex is mandatory with rigorous liason with QP end users is anticipated. In addition, experience of using Oil and gas industry codes in designing utilities system such as potable water, sea water and fire water in an Oil and gas production facility is an added advantage. Duration of works is 8 months.


Related Prooducts: Engineering Procurement and Construction (EPC) Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Participation in the Sebuku Block
INPEX Complete the Transfer of 10% in Masela Block
Approval of Development Plan for the Abadi Gas Field
INPEX Acquires Interest in Walker Ridge Blocks
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us