Installing and Operating Steam Boiler
Reference: 9-2011 1/15/2012, Location: Middle East
Category: Boilers

Scope of Work
The project will cover the following: design, supply, erection and operating steam boiler, the project (on turn key job basis).

The project will be delivered to HRC in guaranteed conditions workings. The boiler should be prefabricated and can be put together in on year , at most, according to the following technical specifications :
- Outlet steam pressure: 38 kg/ cm².
-Outlet steam temperature: 450±5 C°.
- Outlet steam quantity: 25 t/h at least.
- Number of the burners: according to design / preferred with two burners.



Related Prooducts: Boilers Adsorption Equipment & Materials  Aerators  Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Clarifiers  Condensers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Mixers, Static  Nozzles/Diffusers  Steam Generators  Ventilators 

Related Tenders: Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Steam Generators 

Tauhara to Grant Consents for Geothermal Development
Tarapunga-1 Exploration Well Commences Drilling
Pacific LNG Project Gains Government Approval
Apache Farms into Origin Energy's Block L8 PSC
Oil Treating & Refining

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us