Installation of Wet Gas Pipeline
Reference: GT12107100 5/21/2012, Location: Middle East
Category: Oil and Gas Pipeline
Scope of Work
EPIC for instllation of 20 inch wet gas bidirectional pipeline between KM and KS to avoid flaring at either end in case of compressor failure in KM and TEG unit failure in KS.
|