Operation and Maintenance of Two Incinerato
Reference: LT12110800 8/26/2012, Location: Middle East
Category: Maintenance and Repair
Scope of Work
Operation and Maintenance of two Incinerator units on Halul. The incinerator Plant consists of 02 Gencor Beverly 300kg/hr Solid Waste Incinerator units with an Enetex Gas Clean-Up System. Contractor shall carry out the operation and maintenance of the two (02) Incinerator Units at Halul for a period of three (3) years from the effective date of commissioning and handover to QP on completion of refurbishment. Proposed Start Date: 13/11/2012.
|