Construction of New Permanent Accommodation
Reference: 695 9/13/2012, Location: Africa
Category: Construction Contractors
Scope of Work
To build a no. 140 furnished bedrooms with a complete facilities such as recreation centre, restaurant, etc as a turn key project.
The work includes: · Site survey of all the 82 concession area includes oil fields. · Geotechnical investigation. · Determination of the optimum location for the proposed accommodation in terms of accessibility taken into consideration the new developments @ 82 concession. · Basic & Detailed Engineering. · Procurement. · Construction, testing phase (complete Civil, Mechanical & Electrical woks)
|