Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Replacement of 30" ONSAG Pipeline
Reference: GT12112100 9/16/2012, Location: Middle East
Category: Oil and Gas Pipeline

Scope of Work
The scope of work covers the FEED for the replacement of the existing 30-Inch ONSAG Pipeline from Station B to Station S, which in summary entails the:
1). Provision of a new pipeline with the associated block valve stations, pigging, flow metering, telecommunication, power and other required facilities.
2). Provision of leak detection, corrosion protection, fire/gas detection and fire protection systems.
3). Provision of all operating, control and safeguarding systems required for the optimal and safe operation of the new pipeline.
4). Decommissioning, demolition and writing off the replaced section of the existing 30-Inch ONSAG pipeline.



Related Prooducts: Oil and Gas Pipeline General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Tenders: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Tank Truck  Tankers 

Baker Hughes Launches Reservoir Navigation Services
Baker Hughes Develops Service to Reduce SOX
Baker Hughes Opens Saudi Arabia Drill Bit Plant
Baker Hughes Announces Annual Result 2010
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us