EPIC Feed Stream Integration of Fiscal Metering
Reference: GT12113600 10/23/2012, Location: Middle East
Category: Engineering Procurement and Construction (EPC)

Scope of Work
The Project objective is to integrate the feed streams of NGL-1 and NGL-4 plants coming from various sources in order to process any of the feeds in any of the fractionation trains available in NGL-1 or NGL-4 plants. The existing feed storage vessels 6939-V-02A/B/C (currently serving NGL-4 plant) shall be used as buffer to store any excess feed to these NGL plants during plant upsets or shutdown. The existing feed storage vessels 6939-V-02A/B/C have the capacity to store raw NGL feed from NGL-1 or NGL-4 up to 8 hours production. (capacity of vessels 6939-V-02A/B/C is 1458 tonnes).

The proposed feed integration arrangement for NGL-1 and NGL-4 plants will enable QP to have flexible and smooth operations and minimise product loss due to any plant upset or shutdown. The proposed feed integration shall provide optimum piping modifications to improve processing flexibility by mitigating the present limitations for routing of feed to available spare capacity. Export fiscal metering systems shall be provided for Propane and Butane going to NGL Jetty. A common export fiscal metering system for Condensate going through NGL Jetty or MPB shall also be provided.



Related Prooducts: Engineering Procurement and Construction (EPC) Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

DRI Energy Completes a 302 KW Solar System
Envision Solar Signs Second Work Order
Placement of Working Interest in Koliba #3 Prospect
Breitling Oil and Gas CEO Participate in Shale Gas
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us