Reference: A47/2013/001S Drilling Rig Services – Prequalification of Bidders 1/23/2013, Location: Africa
Category: Drilling

Scope of Work
The company intends to issue a Call for Tender for the supply of 1500HP Drilling Rig for Drilling.

Well Design:
* 20 Conductor pre-set
* 17 ½” hole – 13 3/8” casing to 3300 feet
* 12 ¼” hole – 9 5/8” casing to 7600 feet
* 8 ½” hole – 7” Liner 11,000 to 7400 feet
* 1000 feet of 3 ½” EUE Kill string run in hole prior to rig release

Main Components:
* 1500 HP is most preferable 2000HP is also accepted , SCR powered, fast moving, depth rating to 15,000 feet Drilling Rig
* The rig must be in Libya
* 750,000 minimum Derrick rating with 500,000 lbs hook load capacity
* 500,000 lbs set back
* Top Drive, minimum 1000 HP
* 2 x 1500 HP Mud pumps
* 1800 – 2400 bbls Mud System
* 1200 - 1600 bbls water storage
* High speed Shale shakers, desander and desilter
* Connections for centrifuge tie-ins
* Adequate electrical power for 3rd party centrifuge contractor
* 5000 psi BOP and related equipment
* 12,000 feet 5” Grade G or 105 drill pipe
* 9 ½” Drill collars (6)
* 8” Drill collars (24)
* 6 ½” Drill collars (30)
* 4 ¾” Drill collars (24)
* 5,000 feet 3 ½” Grade G or 105 Drill pipe
* 80 – 100 man master-skidded camp
* Wellsite Office for Company Supervisor
* Wellsite Office/Lab for Geologist
* Wellsite office for Company Safety/Operations Supervisor
* Wellsite Sleepers for Supervisors (2), Geologist (2), Safety/Operations Supervisor (2)

Ancillary Equipment:

* 40 Ton Crane and Operator with 24 hrs operator coverage
* 12 Ton Forklift or Front end loader with 24 hrs operator coverage
* Oilfield bed truck and trailer designated to rig
* Complete fishing equipment for contractors downhole tools
* Casing handling equipment for Operators casing string design
* Crew Pickup
* Toolpusher Pickup
* Water transfer pumps and transfer lines for water transfer between reserve pit and rig and between reserve tanks and rigs tanks
* Telecommunication system for contractor usage

Please identify the following with selected Rig Availability:
* Rig Number
* Age of Drilling Rig
* Origin of Drilling Rig
* Age of Camp
* Origin of Camp
* Date of last Rig Inspection
* Date of last Tubular Inspection
* Rig specific Accident record for previous 36 months
* Last three Operators and duration of contract including area of work
* List of Senior and Junior personnel
* Company training grid for Rig personnel
* Valid certificate of the Rig



Related Prooducts: Drilling Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Tenders: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

SABIC, SINOPEC Start-Up Commercial Production
SABIC Ships First Load of Acetone from Saudi Kayan
SABIC & ExxonMobil Elastomers Project Moves into FEED
Sabic, Asahi & Mitsubishi Form Strategic Partnership

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us