Scope of Work
The scope of works shall include the following.
1. Decommissioning existing 3.3 kV and 415 V Switchboards at Maungu Pump Station (i.e. PS 3). This includes disconnecting both power and control cables to all the loads and equipment.
2. Supply, installation, and commissioning of 3.3 kV (1 No.) and 415 V (1 No.) Switchboards at Maungu Pump Station (i.e. PS 3). The installation includes termination onto existing cables for various loads and controls.
3. The Tenderer shall be required to supply and carry out installation for all the works with minimal interruption to KPC‘s normal operations.
4. The Tenderer, together with a team of KPC engineers, shall be required to carry out a structured and comprehensive factory acceptance test (FAT) and site acceptance test (SAT) and sign the relevant forms.
5. The Tenderer shall ensure that before the completion of the project, at least four copies of the relevant manuals and documentation, including as built drawings are availed to KPC in hard and/or software forms.
6. The Tenderer shall offer a comprehensive and complete factory training for Ten (10 No.) KPC maintenance staff. The content and depth of the training shall be agreed with KPC.
7. On award of the contract, the Tenderer shall develop and present to KPC, within two weeks, a comprehensive functional design specification (FDS) document which shall address all functions as stated in this tender document.
Any comissions of the functions shall be re-instated, when noted by KPC at any time in the contract, by the Contractor at no additional cost to KPC.
8. The Tenderer shall propose the estimate implementation period from the date of contract signing to project commissioning. The project implementation schedule shall be provided.
9. The Tenderer shall be required to carry out own surveys of the site in order to come out with a complete quotation before tendering.
10. The Tenderer shall conduct insulation tests on both new and existing power and control cables before terminating them.
11. The Tenderer shall provide in their tender two years‘ worth of maintenance spares as recommended by equipment manufacturer.
12. The Tenderer shall provide in their tender any special maintenance tools required.
13. The Tenderer shall provide in their tender a 1 Year warranty.



Related Prooducts: Switches Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Total Acquires Interest in Deep Offshore Exp. Block
Total Increases its Interest in the GLNG Project
Total & Suncor Form an Alliance in Canada’s Oil Sands
Petrobras Seeks Bolivia Natural Gas Field Stake
Oil and Gas Pipeline

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us