EPIC for NGL 1 & 2 Control Systems Upgrade Project Mesaieed
Reference: BID2700 3/14/2006, Location: Middle East
Category: Monitoring & Control
The requirements are to Upgrade the NGL 1 / 2 plants (including utilities & Storage) control systems from conventional, pneumatic based systems to a proven state-of-the-art microprocessor based control, and monitoring system, together with replace of field instrument to Foundation Fieldbus (FF) technology and install new ESD, F&G, MCM, CCTV, Truck Weighing system, BMS, PA/GA and Telecom Systems. The upgrade shall include construction of new Central Control Building (CCB) and relocating sheds, refurbishing the existing Central Control Room (CCR). Turbo machinery shall be revamped to include new ventilation system, air intake filters, dry seal systems and new fire fighting system. The electrical distribution system shall be replaced with intelligent Motor Control Centers (MCC), replacement of medium voltage CB, new transformers, Emergency Diesel Generators (EDG), Power Factor Correction system, Power distribution management system, and Uninterruptible Power Supply (UPS) System.
Bond: QAR 10,000,000/--
Issue Date: 14/03/2006
Bid Closing Date: 14-May-2006 11:00 hrs Local (GMT +0300)
Location: Qatar
Fee: QAR 500
Bond Validity: 11/10/2006 - (150) days from the Bid Closing Date
Offer Validity: 11/09/2006 - (120) days from the Bid Closing Date
|