Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Provision of Electrical Submersible Pump (ESP) Consultant
Reference: BID7368 2/9/2009, Location: Middle East
Category: Consultancy

Ref. No.: HT783PR08
Bond: US$ 26,700.00
Fee: SR 600 or KD 48
Issue Date: 09/02/2009
Question Closing Date: 25/03/2009
Bid Closing Date: 06/04/2009 14:00
Bond Validity: 04/08/2009 - (120) days from the Bid Closing Date
Offer Validity: 04/08/2009 - (120) days from the Bid Closing Date
Address: Manager, Contracts Department, Al-Khafji Joint Operations P.O.Box 688 Al-Khafji, Saudi Arabia

Scope of Work:
Al-Khafji Joint Operations will install thirty eight ESPs in selected wells over the next five years to maintain and sustain the planned target production rate. Currently six ESP wells are installed as a pilot project.

ESP Consultant Scope of Work
The ESP consultant shall be responsible to provide and perform (but not limited) the following services and activities related to ESP operations of:
1. Subsurface facilities.
2. Surface facilities.
3. Project / contract’s management for ESP upcoming project.
4. Training to the Company (PRD) engineers and operators.

ESPS Consultant Minimum Requirement:
1. Qualification Required: B. Sc petroleum engineering or higher.
2. Experience Required:
a.More than 20 years in petroleum engineering fields (altogether).
b.15 Years in artificial lift field specially in ESP.
c.More than 5 years in contract, financial, and project management.
Company Provision:
1. The company will be responsible to provide transportation to/from the offshore as well as accommodation at the offshore when required by the company.
2. The company reserves the right to require the ESP consultant to perform the short term services inside or outside of the kingdom as a business trip as & when required by the company. In this regard the company will pay for all of the trip days (including travel time days) as per the company policy.
3. The company shall provide an office with all required facilities for the ESP consultant.
4. The company may depending upon availability provide single status suitable furnished accommodation for the ESP consultant. However it is the responsibility of contractor to provide suitable accommodation for the consultant.



Related Prooducts: Consultancy Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Tenders: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

First Solar Agrees to Acquire Multi Gigawatt Utility Scale Photovoltaic Pipeline
EPiC Energy Awarded a Contract for a Sour Gas Processing Facility in The Middle East
Tethys Petroleum Limited: Kyzyloi Gas Production Recommences
Chariot Oil & Gas Limited Trading Update – Continuing Progress
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us