|
|
|
Buzurgan Natural Gas Utilization Treatment Unit
Reference: BID7743 4/15/2009, Location: Middle East
Category: Gas Treating
Ref. No.: PRJ.09.4027
Issue Date: 15-Apr-2009
Bid Closing Date: 10-Jun-2009
Reissue Date: 12-Apr-2010
New Bid Closing Date: 10-Jul-2010
Offer Validity: (120) days from the Bid Closing Date
Bond Validity: (90) days from the Bid Closing Date
Fee: 600 USD
Bid Bond: 1% From the total value of tender price
Company: Missan Oil Company
Scope of Work:
The scope of work shall covers design, detailed engineering, procurement of equipment and materials delivery of equipment and materials CIP Maysan supervision and technical assistance during field construction, erection, testing and commissioning of gas sweating treatment unit. The unit should be designed for 80 mmscfd {(25-30) mmscfd from them is a sweet gas and need to be dehydrated only}. Construction should be carried out by MOC under supervision of supplier representatives.
Scope of work also include detail design hook up drawing isometrics construction drawing, construction and commissioning producers...ect. to facilitate construction of the plant with minimum supervision. It shall include performance guarantees and equipment materials warranty for 12 months after provisional acceptance.
|
Related Prooducts: Gas Treating
Deodorization system
Gas dehydration
Gas sweetening
Gas Treating
General
GTL Processing
LNG Processing
LPG Domestic use
LPG Odorless
Packing
Phase Separation
Scrubbers
Related Tenders:
Gas dehydration
Gas sweetening
Gas Treating
General
LNG Processing
LPG Domestic use
Packing
Phase Separation
Scrubbers
|
|
|
|