Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Drilling and Completion of 30 Wells
Reference: BID7785 4/26/2009, Location: Middle East
Category: Drilling & Well Services

Ref. No.: PRJ.09.4037
Issue Date: 26/04/2009
Re Issue Date: 24/08/2009
The New Bid Closing Date: 10/092009 11:00 hrs Local (GMT + 0300)
Company: Missan Oil Company

Scope of Work:
Drilling and completion of 30 wells on turn key basis as following:
1- (10) ten wells in Halfaya field.
2- (10) ten wells in Noor field.
3- (10) ten wells in Abu Ghirab field.

1- Halfaya oil field:
Drilling, completion and handover of (10) ten vertical wells / producer in Halfaya oil field (Mishrif reservoir) to depth 3350 m on turn key basis (with material & services price list / well).

2- Abu Ghirab oil field:
Drilling, completion and handover of (10) ten vertical wells / producer in Abu Ghirab oil field (Asmary reservoir) to depth 3350 m on turn key basis (with material & services price list / well).

3- Noor oil field:
a. Mishrif reservoirs:
Drilling & completion of (5) five vertical wells (producer) (3700 +/-25) m on turn key basis (with material & services price list / well).

b- Nahr-Umr reservoirs:
Drilling & completion of (5) five vertical wells (producer) (4150 +/-50) m on turn key basis (with material & services price list / well).

Duration:
- Completion of work should be within (12) months, starting (6) months after the date of opening clean & acceptable L/C in favor of contractor.
- Duration of contract is (21) month starting from date of opening of L/C to end the contract.

Materials:
1- Well head & X-mass tree.
2- Casing & liner hunger.
3- Casing accessories.
4- Tubing.
5- Completion equipment.
6- Cement & cement additives.
7- Bits.
8- Mud materials.

Equipments:
1- Drilling rig.
2- Solid separation equipments.
3- Mud lab. full equipped with all devices and chemicals required for mud testing according to API standard required in details.
4- Bops, chock manifolds, kill & chock lines, driller remote chock-burning line and all safety regulation system - details required.
5- Offices for MOC rig supervisors - good sanitary standard, furniture, computers & software for drilling operations, cementing & mud control.
6- Three cars for MOC rig supervisors.
7- Cement pumping units.
8- Open & cased hole logging services, equipment, trucks & ACC.
9- Fire extinguishers & other fire fighting equipment.
10- H2S gas detections equipment & masks.
11- Communication facilities for rig sites and camp and offices (MOC & contractor).
12- Security for camps, rigs & contractor personal.



Related Prooducts: Drilling & Well Services Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Tenders: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

AWE’s Hovea-13 Drilling Update
Final Step in Mongolian PSC Approval Completed
Vestas Sells 50 MW of Wind Energy to China
Vestas Receives Order for V90-3.0 MW Turbines
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us