Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Shutdown Maintenance for NGL-3 Plant, Gas Operations
Reference: BID7844 5/7/2009, Location: Middle East
Category: Gas Processing

Ref. No.: General Tender #GT09106300
Bond: QAR 1,000,000
Fee: QAR 500
Issue Date: 07/05/2009
Bid Closing Date: 07/06/2009 11:00 hrs Local (GMT +0300)
Bond Validity: 04/11/2009 - (150) days from the Bid Closing Date
Offer Validity: 05/10/2009 - (120) days from the Bid Closing Date
Location: Contracts Dept., Operations Division, Qatar Petroleum, PO Box 3212, Royal Plaza, G Wing, 4th Floor Rm G13, Doha.

Scope of Work:
Contractor shall undertake and complete the complete shutdown maintenance works of Static equipment, including without limitation all Instrument, Electrical, Civil works inclusive of valves and related pipe-works in NGL-3 Plant and associated utilities areas located within the NGL complex, Gas operations at Mesaieed Industrial Area in accordance with the specified job list and scope of work, Detailed job plans, Specifications, Standards and codes of practice.

NGL-3 Plant shutdown is scheduled in November 2009 (tentatively) for a period of 28 days inclusive of plant decommissioning & commissioning. Planning and execution of work includes various turn around related activities including but not limited to Pre/Post turn around activities, Multidisciplinary maintenance, Inspection and repairs of piping, equipment and systems; Scaffolding/insulation/painting related activities, Supply of manpower services, Equipment and miscellaneous resources.

Contractor shall be an ISO accredited company with demonstrated capabilities/certifications in ASME "U" & NBBI "R" repairs activities". In case the contractor does not have capabilities/certifications in ASME "U" & NBBI "R" activities, a sub contractor with demonstrated capabilities/certifications in ASME "U" & NBBI "R" activities shall be engaged for carrying out those activities which require these capabilities/certifications. Contractor shall be able to mobilize its sub contractor within 12 hours of notice during the shutdown.



Related Prooducts: Gas Processing Deodorization system  Gas dehydration  Gas sweetening  Gas Treating  General  GTL Processing  LNG Processing  LPG Domestic use  LPG Odorless  Packing  Phase Separation  Scrubbers 

Related Tenders: Gas dehydration  Gas sweetening  Gas Treating  General  LNG Processing  LPG Domestic use  Packing  Phase Separation  Scrubbers 

Sc55 Farm Out Update
Extension of Astrakhanskiy Block Exploration Period
Otto Energy Galoc Field Update
China North East Petroleum Signing of New Well Drilling Contract
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us