Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Execute Works for Al Jurf Phase 2 Project
Reference: BID8168 5/31/2009, Location: Africa
Category: Engineering Procurement and Construction (EPC)

Ref:- TC/09/L135
Issue Date: 31/05/2009
Bid Closing Date: 16/06/2009 at 12:00 hrs local time
Address response: Mabruk Oil Operations, Dhat El-Imad Complex, Tower 2, Floor 15, P.O. Box 91171 Tripoli Libya (GSPLAJ)
Attn.: Mr. Ali Msalem – TC Coordinator
Tel: +(218) 21 33 50 401 Ext. 1436
Fax: +(218) 21 33 50 561
Email address: Ali.Msalem@mabruk-oil.com

Scope of Work:
Mabruk Oil Operations (MOO) intends issuing the tender for the detailed Engineering, Procurement, Supply, Construction, Offshore Hook Up & Integration works, Pre-commissioning and Commissioning of Al Jurf Phase 2 Project :-

EPSCC1: For BD1, FPSO process module and all hook-up and Integration works.
EPSCC2: For BH1 new living quarter platform (including jacket and bridge)

Mabruk Oil Operations wishes to invite the interested local and international Offshore experienced contractors (or their representatives) to submit to MOO their completed Pre-qualification documents for evaluation and preparation of a bidders list.

Al Jurf Field (C137) is an offshore field located about 160 kilometers to the North- West of Tripoli City, Libya.

The request by interested contractors for the prequalification questionnaire should be sent by fax and email strictly to the following address: Mabruk Oil Operations
Ref: Aljurf Phase 2 Project EPSCC1 and EPSCC2

All interested contractors should submit the required Pre-qualification information (Pre-qualification questionnaire) no later than 16/07/2009. Any document submitted after this date will be disregarded.

Important Note:
Notwithstanding the closing date of 16/07/2009, tender shall only have a maximum of 22 working days for submission of the Prequalification answer from date of issue by company.

The duly completed Pre qualification Questionnaire together with TENDERER’s documentation/attachments, with quantity of three (3) sets of paper documents (one (1) set original and two (2) sets copies) and three (3) sets of the electronically scanned documents (each set is stored in a separate CD-ROM) in a sealed envelope, shall be sent to: Company’s Address.



Related Prooducts: Engineering Procurement and Construction (EPC) Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Ensco International Terminates Contract for ENSCO 69 in Venezuela
Otto Energy Operations Update in Turkey
E.ON Puts Plans on Show for £300m Bristol Biomass Plant
Plexus £1.6 Million Contract Extension With BP Egypt
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us