|
|
|
Heavy Maintenance of Gas Turbine Unit
Reference: BID8537 7/11/2009, Location: Middle East
Category: Turbines: Gas
Ref. No.: 94-09-3914
Issue Date: 11/07/2009
Bid Closing Date: 01/08/2009
Offer Validity: (90) days from the Bid Closing Date
Bond Validity: (90) days from the Bid Closing Date
Fee: 600 USD
Bid Bond: 1% From the total value of tender price
Scope of Work:
1- To dismantle, clean, and inspect all parts of the engine.
2- Inspection results to be verified to the OEM design and acceptance criteria. A technical report should be submitted and must include a listing of repairable items and also rejected parts.
3- Carry out all necessary modifications according to (GE) updated standards.
4- Balance of compressor and turbine components in accordance with (GE) standards.
5- Re - assemble and rebuild the engine
6- All replacement spare parts used should be genuine OEM supplied parts.
7- Coating of blades for rotor, stator and other parts to be according to GE standards.
8- Warranty for workmanship and spare parts supply must be covered by the OEM standard warranty terms.
9- On completion of the rebuild of the engines, a full performance test must be carried out measuring all parameters according to GE test schedule.
10- Preserve the engine for long term.
Main parts must be mead by (GE company (USA - UK - Italy)
|
Related Prooducts: Turbines: Gas
Diesel Engine
Engine Parts
General
Generating Sets
Generators
Marine Diesel Engine
Power Pack
Turbines (General)
Turbines: Gas
Turbines: Hydro
Turbines: Steam
Related Tenders:
Diesel Engine
Engine Parts
General
Generating Sets
Generators
Marine Diesel Engine
Power Pack
Turbines (General)
Turbines: Gas
Turbines: Steam
|
|
|
|