EPIC for Uwainat Gas Line to PS-2 Typhoon Turbine
Reference: BID8607 7/20/2009, Location: Middle East
Category: Pipe Lines Installations
Ref. No.: General Tender # GT09108800
Bid Bond: QAR 100,000
Fee: QAR 200
Issue Date: 20/07/2009
Bid Closing Date: 30/08/2009 11:00 hrs Local (GMT +0300)
Bond Validity: 27/01/2009 - (150) days from the Bid Closing Date
Offer Validity: 28/12/2009 - (120) days from the Bid Closing Date
Location: Contracts Dept - Engineering Division, Qatar Petroleum - Doha, PO Box 3212, Ras Abu Aboud, Main Bldg, 2nd Floor, Room 233.
Scope of Work:
Engineering, Procurement Installation and Commissioning (EPIC) works for dedicated Uwainat gas line to Typhoon turbine at PS-2 consisting of the following:
1- Fuel gas conditioning skid consisting of:
a- Filter Coalescer package (1 operating + 1 standby).
b- Electric fuel gas heater.
2- 2" fuel gas supply line from tie-in location on PS-2C to inlet of fuel gas conditioning skid at PS-2G and from the skid to the inlet nozzle of Typhoon turbine.
3- Structural deck extension / modifications.
4- Associated electrical, instrumentation & control, fire & gas and loss prevention works.
|