EPC Contract for Al Jurf Phase 2
Reference: BID8851 8/9/2009, Location: Africa
Category: Engineering Procurement and Construction (EPC)
Ref:- TC/09/L188
Issue Date: 28/07/2009
Bid Closing Date: 10/09/2009
Address response: Mabruk Oil Operations, Dhat El-Imad Complex, Tower 2, Floor 15, P.O. Box 91171 Tripoli
Libya (GSPLAJ)
Attn.: Mr. Ali Msalem – TC Coordinator
Tel: +(218) 21 33 50 401 Ext. 1436
Fax: +(218) 21 33 50 561
Email address: Ali.Msalem@mabruk-oil.com
Scope of Work:
Mabruk Oil Operations (MOO) intends issuing the tender to execute works for Al Jurf Phase 2 Project and wishes to invite interested Offshore experienced Local and international contractors (or their representatives) for the design, engineering, procurement, fabrication, transport, installation required for the offshore transport and installation of the new built facilities (under EPSCC 1 and EPSCC 2) of the Al Jurf Phase 2 project.
EPC 3:
Is the contract for the Offshore Transport and Installation (including fixation) of BD 1 and FPSO process modules, BH 1 new living quarter, Jacket and Bridge ( With minimum lifting capacity of 3000 MTons) (respectively under the contract EPSCC 1 and EPSCC 2).
|