EPC for Alternate Routing to OPP Purge Gas
Reference: 2534-11-027  2/1/2011, Location: Middle East
Category: Engineering Procurement and Construction (EPC)

Scope of Work
EPC for alternate routing to OPP Purge Gas during RFCC Shut Down.

The scope of this project is to install a jump over line at the RFCC battery limits to allow carrier gas to be routed to the propylene storage tanks during RFCC shutdown for reprocessing.

Installation of Tie-ins points for the line already completed during Nov 2010 Shutdown.



Related Prooducts: Engineering Procurement and Construction (EPC) Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Wood Secures A Two-year Extension on Unconventionals Program with Aramco
Wood Commits to 40% Reduction in Carbon Emissions by 2030
Wood to Modernize U.S. Naval Fuel Systems Worldwide
Trading Update for the Six Months Ended 30 June 2020
Oil Treating & Refining
Fuel oil

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us