Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Constructing the Dbessan Gas Station
Reference: 64/2010/A 4/1/2011, Location: Middle East
Category: Gas Processing

Scope of Work
The company plans to further development the southern fields of North Middle Area Gas Exploitation Project. The project involves collecting non-associated gas from five drilled wells (AL Zamleh-1, AL Zamleh- 2, AL Zamleh-4, South AL Rasafa-1, and AL kalaa-1 to a Gas test separation station (DTSS) located at Dbessan site.

The collected gas from the DTSS will be pipelined to the north AL Hussein gas gathering station (NH station)location which is approximately 36kms far from the DTSS, the Pig receiver location at (NH station) is specified in the attached drawing. The proposed gathering system (DTSS)is located in a desert area with some gentle variations in the terrain.



Related Prooducts: Gas Processing Deodorization system  Gas dehydration  Gas sweetening  Gas Treating  General  GTL Processing  LNG Processing  LPG Domestic use  LPG Odorless  Packing  Phase Separation  Scrubbers 

Related Tenders: Gas dehydration  Gas sweetening  Gas Treating  General  LNG Processing  LPG Domestic use  Packing  Phase Separation  Scrubbers 

SNC-Lavalin Awarded FEED Contract from Al Dhafra Petroleum
Atkins to Provide PMOC for Santa Clara BART Extension Project
Atkins & Gama Aviation Awarded Military Airworthiness Review Contracts
SNC-Lavalin Provides 2019 Sustainability Report
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us