EPIC for 16'' Jet A1 pipeline
Reference: GT11106200 5/16/2011, Location: Middle East
Category: Oil and Gas Pipeline

Scope of Work
EPIC of 16'' Jet A1 Fuel P/L from the company refinery to BSV-3 Engineering, procurements/supply & construction of a dedicated system for the supply of JET A1 fuel from the company refinery to BSV-3 by 16 inch dia. pipeline. The estimated length of the pipeline between the company refinery and BSV-3 is about 36.0 km. The system also includes new pumping system (3 nos. Booster pumps & 3 nos. Mainline pumps will be installed in a new pump house inside the company refinery) & associated facilities.

Jet A1 Fuel is currently transported by a multi-product transfer system consisting of a pump station at the the company refinery, a 12 inch multi-product pipeline and a tank farm at Doha Depot situated in the Abu Hamour area on the southern outskirts of the city of Doha, via intermediate station BSV-3. From Doha Depot, it is transported to the existing airport by tankers. A new 18 inch multi-product pipeline, currently under pre-commissioning, will be used to transfer multi-products to Doha Depot. A new 16" Jet A1 Fuel pipeline from BSV-3 to STATION C-1 INSIDE NDIA is under EPIC stage and it is being constructed under contract ref. GC09106100 by DOPET.

Under this contract, the company is laying an estimated 16.5 km of 16 inch internally and externally coated buried pipeline from BSV-3 to STATION C-1 INSIDE NDIA including temporary Pig Launching facility and Tie-in to existing 12 inch multi-product pipeline at BSV3 & pig receiving facilities, filtration, separation, metering facilities with Satellite and Equipment room at STATION C-1 INSIDE NDIA. Since the condition of existing 12 inch multi-product pipeline from the company refinery to BSV-3 is not known, the company has decided to lay the proposed new approximately 36 KM long & 16'' dia. Jet A1 pipeline from the Refinery to BSV-3. Based on the above, purchase order has already been placed by the company for 16" line pipe API 5LX 60, 7.9 mm wall thickness for the Jet A1 Fuel pipeline project. The line pipe will be Free Issue Material for the EPIC Contractor.




Related Prooducts: Oil and Gas Pipeline General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Tenders: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Tank Truck  Tankers 

Farmout of Amadeus Permit EPA 155
Mosman Oil and Gas Announces Sale of Welch Project in Texas
Mosman Oil and Gas Provides Update on Sale of Welch Project
Mosman Announces Placing to Raise GBP400,000
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us