Supply & Installation of 333 m³/h RO
Reference: 42-T-PET-2011 5/26/2011, Location: Middle East
Category: Water treatment Plant

Scope of Work
Supplying, installation, construction and commissioning of 335-340/ m³/h RO unit in the petrochemical plant / Khor Al Zubair on Turn-Key basis.

Scope OF Work:

a) Offer should be submitted as turn key basis of the entire work.

b) The Country of Origin have to be mentioned which is to be one of the followings (Italy, Germany, UK, Japan, USA) and all materials must be brand new.

c) The offer should be cover:
- List of main suppliers for materials and equipments.
- Engineering, soil survey, civil, electrical, mechanical works.
- Material supply for the RO unit with all other equipment and accessories necessary to operate the plant safely, reliably and easy maintenance.
- Installation and supervision.
- Commissioning and performance test for three days continuous operation with full load.
- Functional guarantee for one year in operation.
- Training.

d) Safety during the work executing is contractor responsibility.



Related Prooducts: Water treatment Plant General 

Related Tenders: General 

New L&W Autoline Offers Fastest, Most Reliable Automated Paper Testing Solution
ABB & ASKO to Electrify Norwegian Delivery Fleet
ABB Traction & Battery Technologies to Drive Stadler’s Trains of Tomorrow
ABB Teams up with Yinson on Offshore Oil & Gas Project in Brazil

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us