Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply Tubes & Elbows for Gas Heaters
Reference: 70/2011 8/15/2011, Location: Middle East
Category: Pipes

Scope of Work
Supply (tubes & elbows) for regeneration gas heaters.

- Tubes total length 451cm NPS 4" Sche 40 type bare quant 2

- Tubes total length 200cm, NPS 4" Sche 40 type bare quant 30

- Tubes total length 12 m, or double random. NPS 4" Sche 40 type bare quant 15

- Tubes total length 451cm with, 76mm bare one end, 778mm other end (C.S fins on 19mm height, 0.9 mm thick, 5fins per inch) NPS 4" Sche 40 type finned quant 2

- Tubes total length 381.6cm finned length 366.4cm with equal ends bare (C.S fins on 13mm height, 0.9 mm thick, 5 fins per inch) NPS 4" Sche 40 type finned quant 3

- Tubes total length 381.6cm finned length 366.4cm with equal ends bare (C.S fins on 19 mm height, 0.9 mm thick, 5 fins per inch) NPS 4" Sche 40 type finned quant 2

- Tubes total length 200cm, finned length 170cm with equal ends bare15 cm (C.S fins on 19mm height, 0.9 mm thick, 5 fins per Inc). NPS 4" Sche 40 type finned quant 35

- Elbow (return bend) 4"schuduele 180º S.R per ASTM A234 Gr. WPB. NPS 4" Sche 40 type S.R Elbow quant 30



Related Prooducts: Pipes Anchors  CPVC Pipes  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Pipeline Heating Equipment  Piping Accessories  Plastic Pipes  PP Pipes  PTFE Rods  PVC Pipes  PVDF Pipes  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Related Tenders: Anchors  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Piping Accessories  PTFE Rods  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Chiyoda Awarded EPC Contract for New THC Catalyst Plant
Chiyoda Awarded Contract for New PNG LNG-to-Power Project
Successful Completion of the World’s First Global Hydrogen Supply Chain
Chiyoda Agrees MOU with Mitsubishi & Blue Planet
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us