Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Excavation & Laying 2 Inter-Trip Cables
Reference: STC/OPN/881/11 9/15/2011, Location: Middle East
Category: Cables

Scope of Work
Contractor shall be responsible to carry out all civil works such as manually excavate a shallow cable trench (300 mm depth x 300 mm width x 1,650 meter long), re-instate (backfill) the shallow cable trench accordingly for two (2) identified locations and lay two (2) new cables supplied by the company (6C x 6 mmsq XLPE/PVC/SWA/PVC) in the shallow underground cable trench for both locations.

Excavation and laying 2 inter-trip cables.



Related Prooducts: Cables Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

TDI-Brooks Completes Coring Program at Kings Quay
Investigation of Oil Leak after overpressurising Storage Cell
Thalassa Appoints Non-Executive Director
Epiroc Introduces the DH350 Oil and Gas Rig
Natural Gas
LNG Processing
LPG Domestic use

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us