Smokeless Burner Forwaste Oil & Gas, Surge Tank
Reference: 57.11.9018.01 9/11/2011, Location: Middle East
Category: Vessels, Tanks

Scope of Work
Smokeless burner forwaste oil and gas, surge tank.

1. Specificate of Burner
- Portable.
- Skid mounted.
- Working pressure = 1440 psi.
- Capacity = 10000 bbl/D.
- Emulsion capacity = 50% oil/water suspension.
- Gas capacity = 5 MMSCFD @ 300 psi.
- Check valve air line = 3" water type, 1440 psi.
- Check valve oil line = 3" water type, 1440 psi.
- Oil line connection = 3" fig. 602 female.
- Air line connection = 3" fig. 602 female.
- Ignition system = Butane with electric ignition or any recommended (remote operated).
- Surface coating = Sand blasting, coating inorganic zinc primer (0.3 – 0.4) mm, epoxy resin intermediate coat (0.4 – 0.6)mm , urethane acrylate coat (0.4 – 0.6)mm.
Color: Navy Blue.

2. Specification of Burner control Manifold:-
Ball valve 3" class 600 QT 4
Ball valve 2" class 600 QT 2
Ball valve 1" class 600 QT 2
Check valve 3" class 600 QT 3
Check valve 2" class 600 QT 1
Union 3" fig 602 QT 8
Union 2" fig 602 QT 1
Union 1" fig 602 QT 3
Surface coating: sand blasting, coating inorganic zinc primer (0.3 – 0.4)" mm, epoxy resin intermediate coat (0.4 – 0.6) mm , urethane acrylate coat (0.4 – 0.6)mm.
Color: Navy Blue.

Note: the manifold must have a chock to Restrict the oil flow rate 1/64" division On both side.

3. Surge Tank
Technical Tank:-
Working pressure 150 psi
Working temperature 0 – 100 C?
Vessel size 96" * 120" seam to seam
Capacity 100 bbl
Shell thickness 12 mm
Head thickness 14 mm
- Piping crude inlet line = 3" fig 602 TH
Oil outlet line = 3" fig 602 wing
Gas outlet line = 3" fig 602 wing
Vent outlet line = 3" fig 602 wing
Drain outlet line = 3" fig 602 wing
The vessel to be installed on an oil field type skid with all manifolds and accessories to be within the skid dimension.

Painting and coating
Vessel, skid, pipe work valve and instruments etc. to be externally painted, instrument and valves to be supplied painted in manufacturer's standard.

Spare parts
- Spare parts for all items in this inquiry required.

Training
Will be required for 2 persons. (1 Engineer, 1 Technician) for 7 days except traveling days.

Note:
1- All equipments must be sour services.
2- Country of origin should be from (USA, Canada, Europe, China)




Related Prooducts: Vessels, Tanks Barrels & Containers  Dish Ends  General  Glass Lined Tanks  Metal Pressure Vessels  Metal Tanks  Plastic Pressure Vessels  Plastic Tanks  Steel Plates  Vessels Internals 

Related Tenders: Barrels & Containers  General  Metal Pressure Vessels  Metal Tanks  Steel Plates  Vessels Internals 

Energean to Re-structure Edison E&P Transaction
Energean Announces Karish Update
Karish Pipe Laying and Subsea Systems Installation Completed
Energean Announces Edison E&P Transaction Update
Production

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us