|
|
|
Supply of 80 Ton/hr boilers
Reference: 3628/2011 10/27/2011, Location: Middle East
Category: Boilers
Scope of Work
The refinery intend to build five boilers each with capacity of (80 ton/hr) medium pressure (20 kg/cm2G, 260), with demi-plant of 300 m3/hr and fuel oil unit of 60 m3/hr, Bidders are requested to offer a break down prices for the scope of supply: 1-Basic & detail Engineering 2-Procurement and supply of equipment and material CIP / Daura Refinery site. 3-Civil engineering should be in scope of supply 4- supervision Pre commissioning, commissioning and including test run activities. 5- Inspection activities cover both shop and site (third party inspection certificates) 6- Specific Training of the refinery personal.
|
Related Prooducts: Boilers
Adsorption Equipment & Materials
Aerators
Agitators & Mixers
Air Conditioning & Refrigeration
Bailers, Sand
Blowers
Boilers
Clarifiers
Condensers
Cooling Towers
Dryers, Drying Machinery & Equipment
Emulsifiers
Furnaces
General
Heat exchangers
Mixers, Static
Nozzles/Diffusers
Steam Generators
Ventilators
Related Tenders:
Agitators & Mixers
Air Conditioning & Refrigeration
Bailers, Sand
Blowers
Boilers
Cooling Towers
Dryers, Drying Machinery & Equipment
Emulsifiers
Furnaces
General
Heat exchangers
Steam Generators
|
|
|
|