Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Turbogenerators
Reference: PREQ ON-101 2/28/2012, Location: Asia
Category: Turbines: Gas

Scope of Work
Supply of 4 gas Turbogenerators for power generation.

Each turbogenerator supply package shall include:
Gas turbine.
Gearbox.
Electrical Generator.
Control system.
Fire fighting system (CO2).
Fuel and air feeding package.
Combustion products exhaust package.
Starter.
Noise suppressing enclosure.

Turbogenerator main specifications:
- Nominal electrical power at the terminals of turbogenerator 1,8-2,5 MW.
- Voltage at the terminals of turbogenerator — 10 kV.
- Type of manufacture — container, high grade of manufacture, for outdoor installation.
- Operating temperature range: -40...+40°C.
- Fuel — natural gas (GOST 5542-87).



Related Prooducts: Turbines: Gas Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Hydro  Turbines: Steam 

Related Tenders: Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Steam 

Audited Results for the Year Ended 31 December 2019
President Energy Provides Drilling and Workover Update
President Exports Oil from Argentina for the First Time
President Energy Announces Operational and Corporate Update
Development

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us