Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Provision of Line Pipe
Reference: 104/2012 2/27/2012, Location: Middle East
Category: Pipe Lines Installations

Scope of Work
Line pipe carbon steel butt weld ends hot finished for high temperature service seamless the material conforming to ASTM (A106 GR B) the ends beveled to ANSI (B16.25) & the pipe protected against rust length to (6 or 12 MTS).


Related Prooducts: Pipe Lines Installations Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Keppel Reports Net Profit of S$160m in 1Q 2020
Industry Leaders Collaborate to Develop First End-To-End Decarbonization Process
Keppel Reports Net Loss of S$537m for 1H 2020
Keppel’s FLNG Conversion Solution Achieves 33% GHG Emission Savings
Oil Treating & Refining

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us